中文
English
繁体

PATOVATE 3D Paving Control System

Details

BIPS-368 3D Paving Control System


System Overview

The system first uses a total station to obtain the high-precision three-dimensional coordinates of the paver,

and feeds back the data to the 3D intelligent integrated controller.

The screed is automatically adjusted by comparing the difference between

the design surface and the actual position.At the same time, the system integrates

GNSS positioning and IMU attitude data to simplify the station movement process of the total station.

On this basis, another total station is used for synchronous real-time quality monitoring

to realize dynamic quality management of the paving process,

so as to control the overall construction accuracy at the millimeter level.


Minimalist operation:

Completely get rid of heavy processes such as staking, piling, hanging lines,

and erecting beams, and lay it when you start the machine!

Millimeter accuracy:

Intelligent control of paving height, slope and direction,

the accuracy far exceeds that of traditional processes

Efficiency soared:

   Greatly shorten the preparation time and achieve 24-hour all-weather precise construction

Costs plummeted:

Significantly reduce manpower investment and material waste, and the comprehensive cost is better

Compatible with a wide range of total stations:


1-18.jpg





System configuration

配置图750.1000.jpg




System architecture and principles



Module
Function
Topcon Total Station (Measuring Robot)

Automatically track the

prism to obtain 3D coordinate data

Cross slope sensor

Millimeter-level resolution

slope monitoring (0.01%)

3D integrated controller3D algorithm core, data fusion and signal output
3D smart terminal

10.1-inch touch screen,

construction management and status monitoring

GNSS dual antenna positioning

Real-time acquisition of spatial attitude

and construction position (RTK accuracy)

Handbook

Construction result detection and

coordinate conversion parameter calculation

RTK satellite base stationProvide stable satellite plane information
Industrial routers

The total station, display and control

terminal and handbook form a local area network




Core technical advantages


Intelligent construction to improve efficiency

Pileless paving simplifies the process and shortens the construction period

Intelligent collaboration between the two systems:

The total station and GNSS are mutually prepared in real time,

and the occlusion is automatically switched, and the construction never stops

Optimize the algorithm and move the station quickly:

During the station moving process, the total station + GNSS provides 3D coordinate data to achieve rapid calibration

Smart connectivity, efficient and simple:

The application of industrial routers can be used to stabilize networking in harsh environments,

realize the networking, data collection and remote transmission of total stations,

display and control terminals and notebooks, and ensure the intelligent operation of the 3D paving system


1-19.jpg





Comparison of construction processes


ProjectPATOVATE 3D Paving Control SystemTraditional construction
Preparation for construction

Import data - boot up

and roll out

5-7 days for stakeout piling
Staffing1-2 operators

Many people measure

and erect wire ropes

Precision controlmm-level accuracyLarge manual error
Timeliness

24-hour round-the-clock

precise operation

Daytime construction only
Process management

Real-time 3D monitoring + automatic correction

Manual testing after paving
Material loss

Precise control saves

3-5% of materials

Overconsumption is

generally 5-8%

Safety and securityUnmanned stakeout reduces high-risk operations

The risk of accidents

is high due to the high

number of piles and lines


1-20.jpg



Engineering Case


工程案例-22.jpg

Guangxi Guizhong Expressway



工程案例-15.jpg

Jinan Yaoqiang Airport



工程案例-22.jpg

G3 Jingtai Expressway



工程案例-15.jpg

Nanjing municipal road, Jiangsu Province